Workplan
------------------------------------------------------------------------- WP 1 | WP 2 | WP 3 | WP 4 | WP 5 | WP 6 -------------------------------------------------------------------------
On April 11th 2010 in Delhi the BIOSAFOR consortium presented their preliminary results per individual work package to its team and to a select group from outside the team, including the European Union, Delegation to India. Please download this presentation from the link below:
Presentation Preliminary Results BIOSAFOR
BIOSAFOR consists of six work packages, of which each is devoted to one objective. Work packages 1, 2 and 3 build the fundamental Assessment of Data and Information.
In WP 1 tree species are screened in pot trials according to their behaviour in saline environments. In WP 2 case study areas with their tree species are described and sampled in India, Pakistan and Bangladesh. In WP 3 saline areas are categorized on a regional and global scale based on available soil and water data.
In work packages 4 and 5 are a phase of analysis, while work package 6 develops recommendations and policy measures. In WP 4 the global biomass potential from saline environments is analysed.
In WP 5 supply chains for biosaline biomass, e.g. pulp or timber form biosaline plants are developed from the farmer to the consumer. WP 6 concentrates on resulting policy measures, e.g. regarding biomass supply, economic and environmental measures.
|